Pilot Point ISD Bond @ Work
The bond addresses the district’s long-term needs by improving facilities, classrooms, and learning environments. The proposal also increases safety and security measures district-wide to better protect students, teachers, and support staff.

Completed Projects
Bond 2021
Early Childhood Center:
Renovate toilet rooms
Fire sprinkler system installation
Replace doors and hardware
Improve building systems and site drainage
HVAC system replacement
Roof replacement
Additional covered area for student drop-off and pick-up
Middle School:
Secured entry vestibule installation
Replace Doors & Hardware
Renovate Locker Rooms
Renovate Toilet Rooms
Roof replacement
Upgrade HVAC system
Improve building systems and site drainage
High School:
Secured entry vestibule installation
Renovate Toilet Rooms
Replace doors in Field House area
Roof replacement
Upgrade HVAC System
Improve building systems and site drainage
Renovate plumbing in Field House area
The new Transportation Center supports a growing fleet and ensures safer, more efficient travel for Pilot Point students.
New facility construction for expanded bus operations
Improved entry and exit flow for buses
Dedicated space for bus refueling
On-site maintenance capabilities
Installed vehicle lift for fleet servicing
Transportation Center
Land Purchases
For Future Campus Sites
Berend Property: 40 Acres
Future Middle School
$2,400,714.91
McCutchin Property: 117 Acres
Future High School
$5,054,742.68
Skiles’ Property: 130 Acres
High School Site #2 & Middle School Site #3
$6,536,186.70
2021 Project Overview
-
Fire sprinkler system installation
HVAC system replacement
Roof replacement
Additional covered area for student drop-off and pick-up
Renovate toilet rooms
Replace doors and hardware
Improve building systems and site drainage
-
Secured entry vestibule installation
Roof replacement
Upgrade HVAC system
Replace Doors & Hardware
Renovate Locker Rooms
Renovate Toilet Rooms
Improve building systems and site drainage
-
Secured entry vestibule installation
Renovate Toilet Rooms
Roof replacement
Upgrade HVAC System
Improve building systems and site drainage
Renovate plumbing in Field House area
Replace doors in Field House area
-
Bond 2021 includes the construction of a new facility that will allow additional space for buses to enter and exit, refuel, and maintenance.
-
Purchasing land for multiple future school sites to accommodate district growth.