Pilot Point ISD Bond @ Work

The bond addresses the district’s long-term needs by improving facilities, classrooms, and learning environments. The proposal also increases safety and security measures district-wide to better protect students, teachers, and support staff.

Completed Projects

Bond 2021

Early Childhood Center:

  • Renovate toilet rooms

  • Fire sprinkler system installation

  • Replace doors and hardware

  • Improve building systems and site drainage

  • HVAC system replacement

  • Roof replacement

  • Additional covered area for student drop-off and pick-up

Middle School:

  • Secured entry vestibule installation

  • Replace Doors & Hardware

  • Renovate Locker Rooms

  • Renovate Toilet Rooms

  • Roof replacement

  • Upgrade HVAC system

  • Improve building systems and site drainage

High School:

  • Secured entry vestibule installation

  • Renovate Toilet Rooms

  • Replace doors in Field House area

  • Roof replacement

  • Upgrade HVAC System

  • Improve building systems and site drainage

  • Renovate plumbing in Field House area

The new Transportation Center supports a growing fleet and ensures safer, more efficient travel for Pilot Point students.

  • New facility construction for expanded bus operations

  • Improved entry and exit flow for buses

  • Dedicated space for bus refueling

  • On-site maintenance capabilities

  • Installed vehicle lift for fleet servicing

Transportation Center

Land Purchases 

For Future Campus Sites

Berend Property: 40 Acres

Future Middle School

$2,400,714.91

McCutchin Property: 117 Acres

Future High School

$5,054,742.68

Skiles’ Property: 130 Acres

High School Site #2 & Middle School Site #3

$6,536,186.70

2021 Project Overview

    • Fire sprinkler system installation

    • HVAC system replacement

    • Roof replacement

    • Additional covered area for student drop-off and pick-up

    • Renovate toilet rooms

    • Replace doors and hardware

    • Improve building systems and site drainage

    • Secured entry vestibule installation

    • Roof replacement

    • Upgrade HVAC system

    • Replace Doors & Hardware

    • Renovate Locker Rooms

    • Renovate Toilet Rooms

    • Improve building systems and site drainage

    • Secured entry vestibule installation

    • Renovate Toilet Rooms

    • Roof replacement

    • Upgrade HVAC System

    • Improve building systems and site drainage

    • Renovate plumbing in Field House area

    • Replace doors in Field House area

  • Bond 2021 includes the construction of a new facility that will allow additional space for buses to enter and exit, refuel, and maintenance.

  • Purchasing land for multiple future school sites to accommodate district growth.